ROBUSTEL STORE — COMMISSIONING WORKSHEET V1
Planning worksheet, not proof that a kit has been tested.

1. Record exact gateway, sensor, firmware and software versions.
2. Confirm destination suitability, power supplies, connector pinouts and wiring revision against the manuals.
3. Use a bench setup and a permitted read-only measurement.
4. Record Modbus function/address convention, data type, scale, unit and polling settings.
5. Confirm a plausible value, valid quality/status and a changing latest-update timestamp.
6. Compare the reading with physical conditions or an independent reference.
7. Record local trend and safe alarm persistence/recovery tests, if required.
8. For MQTT, verify topic, payload, unit and timestamp at an independent receiver.
9. Separately confirm RCMS account owner, gateway identity, roles and permitted remote task.
10. Export the supported configuration, record restore instructions and retest recovery.

Evidence fields: expected result / observed result / timestamp / version / owner / pass or follow-up.
Do not include passwords, tokens or personal customer data.
